Boiler Installation in Acton, MA 01720

“The boiler team arrived with a new boiler to install after my current boiler began to leak. Three members worked continuously since they had to maintain heat before leaving. Paul kept me informed at every stage and answered all my questions. They took no breaks the first day as they had to remove and disassemble the old boiler and replace it with the new one. The new boiler was up and working by 4 PM day one. They returned the next morning even in midst of a snowstorm of 7 inches. They finalized the setup, photographed each stage for the permit inspection. They completed the work in mid-afternoon, gave me a debriefing and what to expect with the Pearl assessment and the town fire inspection. They cleaned everything and loaded the original boiler. I helped them out on the slippery driveway by lending them salt to liberate the truck holding the old 400 pound boiler. It is now dry and warm in the boiler room.”

– William T.